Premier Inn Enfield

Enfield, UK

Retrofit for a Greener Future: Brymec and RNW collaborate for a seamless installation of air source heat pumps

  • Main Contractor: RNW Group
  • Client: Whitbread​
  • Project: Premier Inn Enfield
  • Brymec Involvement: Product supply, project planning, delivery logistics, carbon-conscious procurement​

When RNW Group – a long-standing and trusted customer of Brymec-was awarded the mechanical works contract for the Premier Inn hotel in Enfield, the aim was clear: replace the aging gas boiler system with a modern, energy-efficient air source heat pump solution. This project formed part of Whitbread’s broader sustainability drive to switch to electric solutions, reduce emissions and move towards carbon-neutral solutions. As a carbon-neutral manufacturer and supplier, we were thrilled to support Billy and the RNW Group overcome the challenges of this project and deliver a seamless solution.

Products featured

Watch the Project in Action

Discover how this project came together on a live hotel site, hear directly from the teams involved, and see how precision planning and partnership delivered a carbon-conscious solution.

The Challenge

Undertaking this kind of retrofit in a live hotel environment presented numerous challenges. Ensuring guests remained unaffected was paramount, particularly when it came to hot water supply. Space limitations within the plant room further complicated material handling and installation logistics. A solution was needed that would ensure minimal disruption, precise coordination, and reliable product delivery.

air source heat pumps

Brymec’s Tailored Solution

With their longstanding relationship and history of successful collaboration, Brymec and RNW Group worked closely from the very beginning to ensure the project would run smoothly.

In the early planning stages, Brymec’s technical and logistics teams partnered with RNW to scope the system requirements and develop a comprehensive project package. This bespoke package brought together all necessary components for the installation, carefully selected and bundled to match the project timeline and site constraints.

The package was delivered in bulk ahead of the project start, enabling RNW to begin works without delay. Brymec then supplemented this with just-in-time top-up deliveries, precisely scheduled to avoid overstocking and ensure the installation team had the right materials at the right time.

Key products supplied included:

  • Copper press tube and fittings – for fast, reliable, and leak-free installations
  • A comprehensive range of valves – ensuring precise system control and isolation where needed, including the new Brymec PRV
  • Threaded stainless steel pipework and components – providing robust, long-lasting system integrity
  • Support systems – for safe and efficient mounting of equipment and services

This coordinated, pre-planned approach played a critical role in maintaining project momentum and ensuring continuity of hot water for hotel guests throughout.

“The support from Brymec was absolutely faultless. The precision and reliability of their deliveries meant we could stick to our schedule without compromising guest experience.”

Billy Stubbs - RNW Director

A Shared Vision for Sustainability

Brymec, a carbon-neutral business, is proud to support projects that align with its core values of efficiency, innovation, and sustainability. The Enfield project exemplifies how proactive collaboration and smart supply strategies can drive both operational success and environmental impact.

Intrigued to find out more about our journey to carbon neutral? Head to our sustainability page.

brymec m&e equiptment
brymec logo
“Collaborating on projects that drive sustainability is at the heart of what we do. We’re proud to support RNW and Whitbread in bringing carbon-conscious solutions to life.”

Jake Harvey - Head of Projects

Outcome

Through strategic pre-planning and responsive on-site support, the project was delivered efficiently, with no interruption to hotel guests. The new air source heat pump system is now operational-significantly reducing energy consumption and supporting Whitbread’s sustainability goals.